Two 500t bridge cranes for a project in Indonesia have also been successfully delivered recently. The bridge crane is "put into production" immediately after the installation is completed, and it becomes a good helper for the customer's production operations. Due to the large dust in the workshop, Weihua installation and commissioning personnel overcame many difficulties and successfully passed the practical test together with Weihua's new bridge crane, winning praise and praise from customers with their strength!
The project innovatively proposes a double-mechanism lifting scheme, which perfectly meets the requirements of the customer's workshop. Its control system uses information remote monitoring technology, field bus technology, optical fiber technology, and synchronous control technology, and has the functions of anti-tilt, anti-slack of steel wire rope, automatic speed increase, and micro-speed movement.